Figure 12 Service clearances for a six rack system
Table 22 Floor load rating and required clearances for a six rack configuration
Floor Load
Required Clearance (a+b) m
Rating
Clearance (c) m
(kg/m2)
C=0
500
0.1
450
0.7
C=0.2
C=0.4
0
0
0.4
0.1
Service clearance, floor cutout, and floor load rating
C=0.6
C=0.6
0
0
0
0
39