Installation Requirements; Safety Requirements; General Site Requirements; Equipment Clearances - HP P9000 Manual

Site preparation guide
Hide thumbs Also See for P9000:
Table of Contents

Advertisement

3 Installation requirements

Safety requirements

Safety requirements and guidelines are covered in

General site requirements

The customer site must accommodate the delivery and movement of the equipment from the receiving
dock to the installation location in the data center.

Equipment clearances

Receiving area: The receiving dock, storage area, and receiving area must be large enough to
allow movement of and access to crated or packed equipment. The dimensions of a shipping crate
for a single rack are shown in the following table.
Table 1 P9500 shipping crate dimensions
Item
Shipping crate, single rack
NOTE:
P9500 disk array racks are shipped in one of three standard packaging configurations:
Environmental pack - This packaging configuration consists of stretch wrap over corner
protectors. Environmental pack is used for most shipments within the USA that are shipped
directly from the factory to the customer. HP uses authorized carriers with a dedicated fleet
of trucks and specially trained personnel for Environmental pack deliveries.
WARNING!
by carriers that are not authorized by HP. Only HP authorized carriers can transport the P9500
racks in Environmental pack. Contact HP to arrange for Full Factory packaging when the
P9500 rack will be transported after initial delivery by HP.
Full Factory packaging - This packaging configuration consists of a pallet, wooden loading
ramp, inner packaging, and outer corrugated carton assembly. Full Factory packaging is used
for EMEA and for indirect ground shipments in USA and Canada.
WARNING!
after initial delivery from the factory. Contact HP to arrange for Full Factory packaging.
Full Factory packaging with wooden crate - This packaging configuration consists of full
packaging and encased in a wooden crate. Full Factory packaging with wooden crate is used
for air freight shipments from USA.
Other areas: The hallways, doorways, ramps, and elevators must be large enough to allow a
single unpacked rack to be moved to the installation location. Unless the distance between the
receiving dock and the data center is very long, P9500 disk arrays are typically unpacked in the
receiving area and the individual racks with pre-installed equipment are rolled on their casters to
the data center. The following table provides the dimensions of the P9500 disk array.
Table 2 P9500 single rack dimensions
Item
Single rack
10
Installation requirements
Height
87 in./2210 mm
P9500 rack shipments delivered in Environmental packs must not be forwarded
Full Factory packaging must be used any time a P9500 rack is transported
Height
79 in./2006 mm
"Safety requirements" (page
Width
39 in./991 mm
Width
23.6 in./600 mm (add 0.4
in/10mm for side panels)
8).
Depth
53 in./1346 mm
Depth
45 in./1 145 mm (includes
doors)