Figure 6 Service clearances for a two rack system (two DKC)
Table 16 Floor load rating and required clearances for a two rack configuration (two DKC)
Floor Load
Required Clearance (a+b) m
Rating
Clearance (c) m
(kg/m2)
C=0
500
0.1
450
0.3
400
0.5
C=0.2
C=0.4
0
0
0.2
0.1
0.4
0.3
Service clearance, floor cutout, and floor load rating
C=0.6
C=0.6
0
0
0
0
0.2
0
27