2

Preparing for PowerConnect B-DCX-4S installation

TABLE 3
Installation task
Installing the rack mount kit or
port side exhaust kit.
Mounting and securing PowerConnect
B-DCX-4S in rack.
Installing power cables and powering on
the PowerConnect B-DCX-4S.
Establishing serial connection, logging on
to PowerConnect B-DCX-4S, and
configuring IP addresses.
Installing an Ethernet cable, opening a
Telnet session, and configuring the
PowerConnect B-DCX-4S domain ID, date
and time, and additional system
parameters. Verify and back up
configuration.
Installing SFPs. Attaching and managing
fiber optic cables.
Preparing for PowerConnect B-DCX-4S installation
NOTE
Read the safety notices before installation
The following steps are required to ensure correct installation and operation.
1. Provide a space that is 9 rack units (9U) high, 61.19 cm (24.09 in.) deep, and 43.74 cm (17.22
2. Ensure that dedicated electrical branch circuits with the following characteristics are available:
12
Installation tasks, time, and items required (Continued)
in.) wide. 1U is equal to 4.45 cm (1.75 in.). If you do not use the provided port side exhaust kit,
the space needs to be only 8 rack units (8U) high.
The PowerConnect B-DCX-4S can be installed facing either direction in a cabinet, if
serviceability and cooling requirements are met.
200 – 240 VAC, 50–60 Hz (two branch circuits)
Two cables for the 200 - 240 VAC service
Power supply standards
Protected by a circuit breaker in accordance with local electrical codes
Supply circuit, line fusing, and wire size adequate to the electrical rating on the chassis
nameplate
Location close to the chassis and easily accessible
Time estimate
Items required
30 minutes
Refer to the one of the following if you are
mounting the PowerConnect B-DCX-4S in a
rack:
15 minutes
PowerConnect B-Port Side Exhaust Kit
Installation Procedure
PowerConnect B-DCX-4S Mid-Mount Rack Kit
Installation Procedure or
PowerConnect B-DCX-4S Rack Kit Installation
Procedure .
10 minutes
Power cables.
20 minutes
Serial cable (provided in the accessory kit).
Workstation computer with a serial port or
terminal server port and a terminal emulator
application (such as HyperTerminal).
Ethernet IP addresses for the switch.
20 minutes
Ethernet cable for Telnet access.
Refer to the Fabric OS Administrator's Guide.
15 minutes
SFP optical transceivers. Fiber optic cables
and cable ties.
("Safety
notices").
("Power specifications")
are met
PowerConnect B-DCX4S Backbone Hardware Reference Manual
53-1001808-01

Advertisement

Table of Contents
loading

Table of Contents