3
Hardware Installations and
Upgrades
Before You Begin
Before working with your server product, pay close attention to the
on page v
Note: Whenever you service the system, you must first power down the server and unplug all
peripheral devices and the AC power cord.
Tools and Supplies Needed
•
Phillips* (cross head) screwdrivers (#1 bit and #2 bit)
•
Needle nosed pliers
•
Anti-static wrist strap and conductive foam pad (recommended)
System References
All references to left, right, front, top, and bottom assume the reader is facing the front of
the server system as it would be positioned for normal operation.
Preparing for Installation
1. Carefully read
2. Remove all the components from the packaging, inspect them for shipping damage,
then place them on an antistatic surface until you are ready to use them.
If you are using new disk drives, allow them to acclimate to room temperature
before installing them.
3. If you are installing the appliance in a rack, ensure that you have these tools
available:
— Phillips screwdriver
— Bubble level
— Arrange for someone to assist you during installation.
— Ensure ahead of time that you have chosen a suitable location for the appliance
®
Intel
Server System SR2612UR Service Guide
at the beginning of this manual.
"Safety Information" on page v
and the rack. (See
"Safety Information" on page v
manual.)
"Safety Information"
at the beginning of this manual.
at the beginning of this
29
Need help?
Do you have a question about the SR2612UR - Server System - 0 MB RAM and is the answer not in the manual?