DAELIM NS125DLX Service Manual page 158

Table of Contents

Advertisement

Charging System/Battery
Charging Status Inspection
NOTE
•Current level changes according to the status of
battery charging. Inspect the fully charged
battery with its voltage running at 13.0~13.2V
between battery terminal.
•If the engine is started by a starter motor, large
level of current may flow sometimes because the
battery power is consumed during starting.
● Warm up the engine, and install a fully charged
battery.
● Connect a voltmeter between battery terminals.
Tester: PVA multi-tester
● Connect an ampere meter between the main fuse
terminals. Start engine increase the engine speed
slowly, and check the charging voltage and
current.
Charging current: 0-0.14 A/5,000rpm
Controlled voltage(Charger side): 13.0-15.0V / 5,000rpm
(Lamp side):12.0-14.0V / 5,000rpm
Lighting System Control voltage Check
● Remove the front cover. (⇨ 4-3)
● Loosen the 4 headlight setting screws, and remove
the headlight.
NOTE
•Check voltage with the headlight coupler
connected.
● Start engine turn the light switch on set the
dimmer switch to Hi, and check voltage between
the blue (+) and green (-) (lamp side).
NOTE
•Use an AC range for checking.
If the digital tester used: 10.0〜 〜 13.0V / 5,000rpm
NOTE
•Contact with the tester handle bar during test
may induce electric-shock.
Tester: PVA multi-tester
15-4
Earth cable
Ampere meter
Battery (-)
PVA adopter

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ns 125 dlx

Table of Contents