Initial Start Up - Scotsman C2648 - SERVICE MANUAL 11-2010 Service Manual

Hide thumbs Also See for C2648 - SERVICE MANUAL 11-2010:
Table of Contents

Advertisement

C2648 Service Manual - Installation

Initial Start Up

1.
Remove front and left side panels. Check
machine for any packing or wires rubbing
moving parts. Note location of control board
in upper left corner of the machine's front.
2.
Switch on the electrical power to the machine.
Observe that some of the control's indicator
lights glow and its display shows O.
3.
Wait 4 hours for the compressor's crankcase
heater to warm up the oil in the compressor.
1. Open the water supply valve.
2. Turn the receiver's outlet valve to the full open
position.
3. Push and release the ON button.
The indicator light will begin to blink F. The purge
valve will open and the water pumps will start. The
inlet water valve will open to add water to the
reservoir. After a few seconds the purge valve will
close and the water pumps will stop. Water will flow
into the machine until the reservoir is full. The hot
gas valves and harvest assist devices will activate
and the liquid line solenoid valve will open, then the
compressor, remote fan motor and water pumps
will start. The display will show a continuous F. Five
seconds later the hot gas valves will close and the
harvest assist devices will return to their standby
positions. Warm air will be discharged from the
condenser coil.
4. During the Freeze cycle move each curtain to
confirm the controller is getting the signal from
the curtain switch. Two of them will cause the
SW1 or SW2 light on the control board to blink
ON when the curtain moves away from the
evaporator and OFF. One of the curtains will
cause the period in the display code to blink
ON when the curtain is moved away and OFF
when returned to its normal position. Note:
Moving the curtain during the Freeze cycle has
no affect on unit operation.
5. Observe the Ready for Harvest indicator light.
It may blink early in the freeze cycle, that is
normal. The control will ignore that signal for
the first 6 minutes of freeze.
6. When the ice has frozen enough, the Ready for
Harvest indicator light will be on steady. After
it's been on steady for a few seconds Harvest
will begin.
7. The display shows an H.
The hot gas valves open and the harvest assist
mechanisms are activated. The purge valve opens
to drain some water, when it does the inlet water
valve opens to refill the reservoir. After a few
seconds the purge valve closes but the inlet water
valve continues to fill the reservoir. Harvest
continues until the ice is released as a unit from
each evaporator and forces each curtain to open.
When all curtains have opened and re-closed the
controller returns the unit to a freeze cycle.
8. Check the ice harvested for proper bridge
thickness. The ice bridge is factory set at 3/16
inch. If needed, adjust bridge thickness. Do
NOT make it too thin.
9. Determine the water purge setting from the
table on the next page. If desired, change the
setting to accommodate the local water
conditions.
10. Return the panels to their normal positions and
secure them to the machine.
11. Instruct the user in the operation of the
machine and its maintenance requirements.
12. Fill out and mail the warranty registration form.
Typical Ice Making Cycle Times (minutes)
Listed times are for clean machines. Cycle times at
startup will be longer until the system stabilizes.
Model
C2648R
November 2010
Page 15
o
o
70
F. cond air
90
F. cond air
/
/
o
o
50
F. water
70
F. water
11 - 13
13 - 15

Advertisement

Table of Contents
loading

This manual is also suitable for:

C2648sr-3C2848mr-3

Table of Contents