Precharged Line Routing - Scotsman C2648 - SERVICE MANUAL 11-2010 Service Manual

Hide thumbs Also See for C2648 - SERVICE MANUAL 11-2010:
Table of Contents

Advertisement

C2648 Service Manual - Installation

Precharged Line Routing

Do not connect the precharged tubing until all
routing and forming of the tubing is complete. See
the Coupling Instructions for final connections.
1. Each set of pre-charged tubing lines contains a
1/2" diameter liquid line, and a 5/8" diameter
discharge line. Both ends of each line have quick
connect couplings, the end without access valves
goes to the ice maker.
Note: The openings in the building ceiling or wall,
listed in the next step, are the minimum sizes
recommended for passing the refrigerant lines
through.
Minimize
tubing routed
outside of the
2. Have the roofing contractor cut a minimum hole
for the refrigerant lines of 2". Check local codes, a
separate hole may be required for the electrical
power supply to the condenser.
Caution: Do NOT kink the refrigerant tubing while
routing it.
3. Route the refrigerant tubes thru the roof opening.
Follow straight line routing whenever possible.
Excess tubing may EITHER be coiled up INSIDE
the building OR cut out prior to connection to the
ice maker and condenser.
If the excess tubing is cut out, after re-brazing the
tubing must be evacuated prior to connection to the
ice maker or condenser.
If the excess tubing is to be coiled, spiral it
horizontally to avoid excess trapping in the lines.
5. Have the roofing contractor seal the
holes in the roof
per local codes
November 2010
Page 10
Best Practice: Coil
excess tubing inside
the building in a

Advertisement

Table of Contents
loading

This manual is also suitable for:

C2648sr-3C2848mr-3

Table of Contents