Verifying Proper Operation; Installation Checklist - Dacor ER36D Installation Instructions Manual

Installation instructions
Hide thumbs Also See for ER36D:
Table of Contents

Advertisement

Verifying Proper Operation

Before operating the range, read the accompanying use and
care manual completely. It contains Important safety, service and
warranty information.
1.
Before beginning the test procedure, ensure that all cooktop
control valves are in the OFF position, and all burner rings,
burner caps, and grates are properly positioned on the
cooktop frame. Turn on the gas supply at the shut-off valve.
2.
Check for gas leaks.
3.
Turn on power to the range.
4.
Set the time of day: Press the clock key. Enter the time on
the number keypad (within 6 seconds). Press START.
5.
Press the
BAKE key.
6.
Enter the temperature of 350°F on the keypad.
7.
Press
START.
8.
The display should show
temperature.
9.
Press the
CANCEL-SECURE key to stop the oven heating
process.
10.
Test one of the burners by pushing the knob in and turning it
counterclockwise to the HIGH position. It may take up to four
seconds for ignition to occur, at which time the ignitor will stop
sparking. If ignition does not occur within four seconds, turn
off the knob, wait for at least five minutes to allow any gas to
dissipate, then repeat the ignition test. After ignition, rotate
the control knob counterclockwise
from HIGH to LOW to adjust the
flame height progressively. When
the range is installed properly, the
flame will be steady and quiet.
It will also have a sharp, blue
inner cone that will vary in length
proportional to the burner size.
Dacor's Smart Flame™ feature
reduces the flame under the grate
fingers to increase grate life. If the
range is equipped for use with LP
gas, the ends of the flame may be yellow at the tips, which is
normal.
11.
Turn the control knob to the
12.
Repeat the ignition test for all remaining burners.
If the range does not operate properly, follow these
troubleshooting steps:
1.
Verify that power and gas are supplied to the range.
2.
Check the electrical connections and gas supply to ensure
that the installation has been completed correctly.
3.
Repeat the above bake test or burner ignition test.
4.
If the appliance still does not work, contact Dacor Distinctive
Service at (877) 337-3226. Do not attempt to repair the
appliance yourself. Have the model and serial numbers
available when you call. See page 3 for location.
Dacor is not responsible for the cost of correcting problems
caused by a faulty installation.
18
Installation Instructions
BAKE, and the preheating
Normal Flame
OFF position.
OFF Icon

Installation Checklist

To ensure a safe and proper installation, the following
checklist should be completed by the installer to ensure
that no part of the installation has been overlooked.
Proper installation is the responsibility of the homeowner.
The importance of proper installation of your Dacor range
cannot be overemphasized.
Has the plastic coating been peeled off the outside of the
range? Have all packaging materials been removed from
inside the oven?
Are all leveling legs extended down to make contact with the
floor? Is the unit level? See page 7.
Is the range secured in place with the provided anti-tip
bracket and foot according to these instructions? See page 7.
If the wall in back of the cooktop is combustible, is a
backguard installed?
Is the range wired and grounded according to these
instructions and in accordance with all applicable electrical
codes? Has the electrical access cover been replaced? See
pages 4 and 10 - 15.
Has the gas supply inlet pressure been measured to ensure
that it does not exceed the maximums stated in these
instructions. See page 4.
Is the range connected to the gas supply according to these
instructions and in accordance with all applicable codes?
Did the installer check the gas supply for leaks? Has the gas
regulator cover been re-installed? See page 15.
Is the oven door properly installed according to these
instructions? See page 16.
Have the burner knobs been installed in the proper locations?
See page 16.
Are the burners and grates properly installed according to
these instructions? See page 17.
Has proper operation been verified? Has the warranty
been activated on-line or the warranty card been filled out
completely and mailed?
WARNING

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Epicure er48dEpicure er36d-cEpicure er48d-c

Table of Contents