Download Print this page

DKV BOX EUROPE On Board Unit User Manual page 38

Advertisement

OBU Manual
21*
CONSORZIO PER LE AUTOSTRADE SICILIANE
22
SOCIETA' ITALIANA TRAFORO AUTOSTRADALE DEL FREJUS S.p.A. A32
23
CONCESSIONI AUTOSTRADALI VENETE S.p.A.
24
SOCIETA DI PROGETTO BREBEMI S.p.A.
25
AUTOSTRADA PEDEMONTANA LOMBARDA S.p.A.
26
TANGENZIALE ESTERNA S.p.A.
27
SUPERSTRADA PEDAGGIO PEDEMONTANA VENETA S.p.A.
The toll domain "ITsit" includes the toll chargers and toll domains listed in the table above with the exception
of:
the Montblanc Tunnel (Societa'italiana per azioni per il traforo del Monte Bianco),
the Great St. Bernhard Tunnel (Societa'italiana traforo Gran San Bernardo S.p.A.),
the Frejus Tunnel (Societa' Italiana Traforo Autostradale Del Frejus S.I.T.A.F.),
*the above mentioned toll domain 21 of the toll charger
o „Consortio per le Autostrade Siciliane" (A18, A20).
Service specific changeable parameters
For the toll service Italy (ITsit) the driver should update the following parameters on the OBU according actual
state:
Number of trailer axles
Important information regarding failed payment in semi-closed systems - „Mancato Pagamento":
If, while driving through a lane exclusively reserved for the electronic toll service, the traffic light is red and/or
the barrier does not go up, the driver must stop and press the help button on the column to request assistance.
In this case, the Toll Charger will initiate the credit recovery procedure ("Mancato Pagamento"). For the
passage on all other types of freeways, payment can be made in the designated way (cash and/or approved
cards).
A „Rapporto di Mancato Pagamento Pedaggio – RMPP" (English: receipt of missing payment) is issued to the
driver, if - at the moment of the exit - no toll payment device (OBU) can be used for toll payment. In this case,
the driver will receive the "Mancato Pagamento" and must pay subsequently. The reason for this can be a
failed OBU registration or if the wrong lane is used.
No electronic trip detail data is created for these manual transactions. It is the responsibility of the customer to
pay the receipt within the deadlines specified (between 5 and 15 days). A failure to comply to this will result in
high penalties.
Version 6.7, GM 4.8.1
July 15, 2024
A18, A20
A4, A57, Raccordo Marco Polo
A35
A36, A59, A60
A58
Vicenza – Treviso
38

Advertisement

loading
Need help?

Need help?

Do you have a question about the BOX EUROPE On Board Unit and is the answer not in the manual?

Subscribe to Our Youtube Channel