Installation Guide
3
Installation
Caution
Before installing the device, make sure that you have carefully read the requirements described in Chapter 2.
3.1
Installation Procedure
3.2
Before You Begin
Carefully plan and arrange the installation location, networking mode, power supply, and cabling of the device
before installation. Confirm the following points before installation:
The installation site provides sufficient space for heat dissipation.
The installation site meets the temperature and humidity requirements of the device.
The power supply and required current are available in the installation site.
The selected power supply modules meet the system power requirement.
The network cables have been deployed in the installation site.
The installation site meets all requirements described in this guide.
The device meets the customers' requirements.
13
Installation
Need help?
Do you have a question about the Reyee RG-EST450G and is the answer not in the manual?