Installation Guide
2.2
Installation Environment Requirements
To ensure normal operation and a prolonged service life of the device, the installation site must meet the
following requirements.
2.2.1
Environment
Install the device in a well-ventilated environment. If it is installed in a closed room, make sure there is a good
cooling system.
Make sure the site is sturdy enough to support the device and its accessories.
Make sure the site has enough space for installing the device and leave sufficient space around the device
for ventilation.
Bridge Type
5 GHz bridge
2.4 GHz bridge
Distance Between Base Station
and Customer Premises
Equipment (CPE)
500 m (0.13 mi.)
1 km (0.62 mi.)
2 km (1.24 mi.)
3 km (1.86 mi.)
4 km (2.49 mi.)
5 km (3.11 mi.)
6 km (3.73 mi.)
7 km (4.35 mi.)
8 km (4.97 mi.)
9 km (5.59 mi.)
10 km (6.21 mi.)
11 km (6.84 mi.)
12 km (7.46 mi.)
13 km (8.08 mi.)
14 km (8.70 mi.)
15 km (9.32 mi.)
50 m (164.04 ft.)
100 m (328.08 ft.)
300 m (984.25 ft.)
10
Preparing for Installation
Recommended Installation
Height (Above the Obstacle)
2.6 m (8.53 ft.)
3.5 m (11.48 ft.)
5.2 m (17.06 ft.)
6.3 m (20.67 ft.)
7.3 m (23.95 ft.)
8.2 m (26.9 ft.)
9 m (29.53 ft.)
9.7 m (31.82 ft.)
10.5 m (34.45 ft.)
11 m (36.09 ft.)
11.6 m (38.06 ft.)
12 m (39.37 ft.)
12.8 m (41.99 ft.)
13.3 m (43.64 ft.)
13.8 m (45.28 ft.)
14.3 m (46.92 ft.)
1.2 m (3.94 ft.)
1.7 m (5.58 ft.)
3 m (9.84 ft.)
Need help?
Do you have a question about the Reyee RG-EST450G and is the answer not in the manual?