Procedure
How to power up the ENET
Step
4
5
6
7
8
How to power down the network
This section provides the steps to follow when you power down the DSNE
and the ENET.
Double shelf network equipment
Refer to procedure 10-3 to power down the DSNE.
10-2xxx
(continued)
Action
Access the System level of the MAP display from the
network (NET) level.
Busy the ENET shelf.
Load the software into the shelf. Only use the parameter
file name if you require a specified ENET load. If you do not
use the parameter file only when required, the system loads
the default file identified in tables PMLOADS and ENINV
(enhanced network node inventory).
Test and RTS the shelf. If all tests pass, the shelf is InSv. If
a test fails, refer to the test response and logs to determine
why the test failed.
Allow calls to be routed to the other shelf.
DMS-100 Family Networks Maintenance Guide BASE10
Advanced problem solving procedures 10-3
—end—

Advertisement

loading
Need help?

Need help?

Do you have a question about the DMS-100 Series and is the answer not in the manual?

Questions and answers