Download Print this page

Labconco Protector 3944300 User Manual page 7

Demonstration hoods

Advertisement

C
h
a
p
t
e
r
C
h
a
p
t
e
r
P
r
e
r
e
q
u
i
P
r
e
r
e
q
u
i
Before you install the Protector Demonstration Hood, you need to prepare
your site for installation. Carefully examine the location where you intend
to install the hood. You must be certain that the area is level and of solid
construction. In addition, a dedicated source of electrical power should be
located near the installation site to power the accessory FilterMate
Portable Exhauster or other apparatus.
Carefully read this chapter to learn the requirements for your installation
site:
 The support requirements.
 The location and air current requirements.
 The exhaust and blower requirements.
 The electrical power requirements.
 The space requirements.
Refer to Appendix B: Dimensions for complete Protector Demonstration
Hood dimensions.
Refer to Appendix C: Specifications for complete electrical and
environmental conditions, specifications and requirements.
Support Requirements
At a minimum, the supporting structure usually consists of a base cabinet,
or a base stand and chemically-resistant work surface. When setting up a
chemical station, a mobile stand or cart is allowable. Labconco
manufactures a mobile cart with work surface specifically designed to
support the Protector Demonstration Hood and FilterMate Portable
Exhauster. The cart is supplied with the Mobile Protector Demonstration
Hood or can be ordered separately as an accessory. See Chapter 7 for
accessories.
Product Service 1-800-522-7658
2
:
2
:
s
i
t
e
s
s
i
t
e
s
3

Advertisement

loading
Need help?

Need help?

Do you have a question about the Protector 3944300 and is the answer not in the manual?

Questions and answers