Installing The Zoneline - GE AZ61H12DAB Owner's Manual And Installation Instructions

Heat/cool and heat pump models
Hide thumbs Also See for AZ61H12DAB:
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
INSTALLING THE ZONELINE
[] INSTALL THE WALL CASE AND
EXTERIOR GRILLE
The RAB71Aseries or RAB77A4wall case must be
properlg installed per instructions packed with the case.
• Removethe corrugated stiffener and the outdoor
protective panel. Use the slit in the outdoor panel
as a handhold and push out.
panel
Stiffener
• Install the exterior grille from the room side following
instructions packed with the grille.
Insulated
Wall Case
This unit is designed to be installed in a GE plastic
or an insulated steel wall case. This minimizes
condensation from forming on the room side of
the case.
The RAB71Aseries wall cases are insulated. Insulation kit
RAKgO1L is available for use with RAB77A4or existing
uninsulated wall cases when needed.
NOTE:For installation with a subbase or duct adapter,
see the instructions packed with those kits.
121PREPARE THE UNIT
• Carefullg remove shipping tape and foam shipping
blocks from the room cabinet, compressor and
vent door. There mag be multiple blocks and pieces
of shipping tape that need to be removed.
(Locations ma,
• Remove the room cabinet bg pulling it out at the
bottom to release it (1);then lift it up to clear the rail
along the unit top (2).
• If vent door is to be operational, remove shipping screws
from the front side of the vent door,if present.
Remove two
screws
(ifoperation is
desired)
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents