Installing the Zoneline
locations.
1. Plan for proper electrical supply, drains and ductwork locations.
1. Complete rough in plumbing for primary and secondary condensation drains.
2. Install the Louver and Wall Plenum
Refer to instructions included in the louver kit RAVAL4 for proper installation procedures.
Refer to instructions included in the wall plenum kit RAVWPT15B for proper installation procedures.
3. Install and Level the Drain Platform
1.
Condensate Disposal System
condensate onto the hot outdoor coil.
When high outdoor humidity prevents the slinger from disposing of all condensate, the excess condensate
NOTE: If the primary drain system fails to remove all of the condensate from the unit, any excess
condensate will overflow from the drain pan into the secondary drain (if connected), and drain outside
the building. This is your indication that the chassis or drain requires servicing.
49-5000640 Rev. 0
INSTALLATION SUMMARY
INSTALLATION INSTRUCTIONS
7. Connect the remote thermostat.