Omron WS02-LCTC1-E - V2.60 REV 12-2003 Manual page 42

Table of Contents

Advertisement

Installation
If conversion is specified, the following dialog box will be displayed.
Specify the path of the CX-Process Monitor tags (i.e., the db path)
and click the Execute Button. (If there is more than one tag file,
double-click TrgrpCnv.exe under Omron\CX-Process Monitor to dis-
play the above Trend File Conversion Dialog Box. Then click the
Browse Button, specify the tag file, and click the Execute Button to
convert each file.) When conversion is completed, click the Finish
Button.
The installation process will continue.
If installation is completed normally, the following dialog box will be dis-
played.
11. Click the Finish Button.
Note
1. To uninstall CX-Process Monitor, first end the Monitor process (from the Set-
up Dialog Box, click the Shut Down Button), and then uninstall.
2. If the dialog box in step 10 is displayed while CX-Process Monitor is being
installed (refer to note (a) in step 10 on page 30), after installation select
Section
2-1
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sysmac cs seriesWs02-lctc1-eCx-process monitor 2.6

Table of Contents