FinsGateway Settings when Connected Using Controller Link
4) Set the Node to 2.
5) Enter the node to be refreshed.
6) Enter the node to be refreshed.
• Set the number of words in Area 1 to 636, and set the Offset to 0.
• Set the number of words in Area 2 to 0, and set the Offset to 0.
• Click the Add Button. This will add Node 2 to the list. To continue, add Node 2 to the list.
• Check that the Node in Step (4) is set to 1.
• Set the number of words in Area 1 to 100, and set the Offset to 536.
• Set the number of words in Area 2 to 0, and set the Offset to 0.
• Click the Add Button. This will add Node 1 to the list.
7) Check that in Node 2's Area 1, the number of words is set to 636 and the Offset is set to 0, and
that in Node 1's Area 1, the number of words is set to 100 and the Offset is set to 536.
4. Click the Next Button to proceed to the next step.
5. Proceed to Edit Controller Link Data Link Table (2). Normally, use this screen to set the data link
refresh order, but here click the Next Button to proceed to the next step.
6. Click the Finish Button. The verification dialog box will be displayed. Click the Start Button.
This completes the data link settings. When you click the Start Button, the data link will start.
Note Check that the Controller Link Unit's indicator shows that the data link is operating. If there is an error, check
for troubleshooting procedures using the Controller Link Unit Operation Manual.