Procedures For Operation And Setting Parameters - Omron G3PW - MANUAL 2 User Manual

Power controllers
Hide thumbs Also See for G3PW - MANUAL 2:
Table of Contents

Advertisement

Procedures for Operation and Setting Parameters

4-5

Procedures for Operation and Setting Parameters

Operating Procedure
40
Installation and Wiring
Turning ON the Power
* When the power is turned ON, output will start immediately.
Be careful not to allow large values to be input for current or
voltage signal until the parameter settings have been
completed.
* If the power is turned ON with no load connected, an SSR
short-circuit (E10) alarm will occur but you will still be able to
set the parameters.
* The default for the main setting is 4 to 20 mA or 1 to 5 V. The
output mode is for an output proportional to phase angle of the
input (the same mode as the G3PX).
Parameter Settings in the Initial Setting Level
Press the LVL Key for at least 2 s to move to the initial setting
level. Then set the following parameters in order, using the
parameter setting procedure.
• Settings related to I/O mode
• Settings related to auxiliary input functions
• Settings related to alarms
After the parameter settings have been completed, press the LVL
Key for at least 2 s to return to the monitor level.
Parameter Settings in the Adjustment Level
Use the following procedure to set the parameters in the
adjustment level as needed.
Press the LVL Key to move to the adjustment level.
Set the parameters in the adjustment level (such as the Soft-start
Up Time and the Output Upper Limit).
After the parameter settings have been completed, press the LVL
Key to return to the monitor level.
Actual Operation
Section 4-5

Advertisement

Table of Contents
loading

Table of Contents