Installation And Wiring - Omron 3G3MV-P10CDT-E User Manual

Programmable controller option board
Hide thumbs Also See for 3G3MV-P10CDT-E:
Table of Contents

Advertisement

Installation and Wiring

34
4.
Mount the mounting base (included as an accessory) onto the screw-hole
originally used for holding the Operator and the terminal cover to the body of
the Inverter, and using one of the provided screws, secure the mounting
base.
5.
After aligning the positions of the PLC Unit connector and the Inverter con-
nector, push the frames of the Inverter and the Unit together until they click.
6.
Tighten the fixing screws on the upper part of the PLC Unit, to the mounting
base attached in step 4.
7.
Attach the Operator and the LED hood to the front side of the PLC Unit. Re-
move the screw of the Inverter front cover and use it to secure the LED hood
and the operator to the Inverter.
SECTION 3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3g3mv-p10cdt3-e

Table of Contents