1-5 Preparation for Operation

1, 2, 3...
16
Follow the steps listed below when setting up a 3G3MV-P10CDT system.
1.
System Design
• Select a 3G3MV-P10CDT Unit with the specifications required in the
controlled system.
• Design external fail-safe circuits such as interlock circuits and limit cir-
cuits.
2.
Installation
• Install the Unit on the Inverter
3.
Wiring
• Wire the Inverter and I/O devices.
• Connect communications devices if necessary.
• Connect the Programming Console.
4.
Initial Settings
• Set the Communications Switches on the front of the CPU Unit, if nec-
essary. (The switches must be set when a device other than the Pro-
gramming Console is connected or the standard communications set-
tings are not used.)
• Connect the Programming Console, set the mode switch to PROGRAM
mode, and turn ON the Inverter.
• Check the Unit's LED indicators and the Programming Console's dis-
play.
• Clear the PLC's memory. (All Clear)
• Make PLC Setup settings.
5.
Create Ladder Program
• Create a ladder program to control the system.
6.
Write Ladder Program in PLC
• Write the ladder program in the PLC with the Programming Console or
transfer the program to the PLC from the Support Software.
7.
Test Run
• Check I/O wiring in PROGRAM mode.
• Check and debug program execution in MONITOR mode.
SECTION 1