Chapter 2: Installation
Chapter 2: Installation
2.1 Planning your installation
Site requirements
This chapter describes how to install and calibrate the ST60 Club
House Wind instrument, and associated Wind Vane transducer.
The transducer is connected to the rear of the instrument.
For advice, or further information regarding the installation of this
equipment, please contact the Raytheon Product Support Department
or your own National Distributor.
Before starting the installation, spend some time considering the best
positions for both transducer and instrument, such that the Site
requirements and the EMC Guidelines are satisfied.
Wind Vane
The Wind Vane has a cable connected, and is supplied with a junction
box and a set of spade terminals.
The location for the Wind Vane must:
• Allow reasonable access for installation and servicing.
• Be as high as possible and away from any object which may shield
the Wind Vane or otherwise disturb the air flow.
• Provide a horizontal mounting surface. If a surface (e.g. mast top) is
otherwise suitable but not horizontal, make up a suitable wedged
packing piece to provide the necessary horizontal surface.
Typical Wind Vane mounting
Packing piece
D4505-1
7