Chapter 3: Installation
Chapter 3: Installation
This chapter describes how to install the ST60 Multi instrument, and
where supplied, the Auxiliary Alarm.
For advice, or further information regarding the installation of these
products, please contact the Raytheon Product Support Department or
your own National Distributor.
3.1 Planning your installation
Before starting the installation, spend some time considering the best
position for the equipment, such that the Site Requirements and the
EMC Guidelines (below) are satisfied.
Site requirements
With standard
bezel
110mm (4.33in)
With low
profile bezel
123mm (4.85in)
Instrument dimensions
24mm
15mm
(0.95in)
(0.6in)
6.2mm
35mm
(0.25in)
(1.4in)
13
D4401-1