3.1 Flow of Operations up to Measurement Startup

3.1 Flow of Operations up to Measurement Startup

This section explains the flow of operations up to measurement startup by using workpiece
detection mode as an example.
1.
Before power ON
Check package contents and confirm that all parts are complete.
2.
Installation and wiring
Install this product and connect theoptional cables according to the installation and wiring
methods.
1.
"3.2 Sensor Installation"
2.
"3.3 Sensor Installation Direction and Angle"
3.
"3.4 Optional Cable Connection Method"
3.
Initial setup
Turn the power ON and perform the initial setup.
1.
"3.6 Initial Startup Settings"
4.
Setting up the functions
Perform the necessary function settings according to your environment.
"4.1 List of Functions"