Completing The Commissioning Process - Miele PDR 908 HP Operating And Installation Instructions

Heat-pump dryer
Table of Contents

Advertisement

Setting up a payment system
If you wish to set up a payment system,
read the "Payment system" section of
the "Supervisor level" chapter. These
settings can only be changed during the
initial commissioning process. If you
wish to change the settings after the
commissioning process, please contact
Miele Service.
If you do not wish to set up a payment
system, you can skip this stage.
Payment system
No payment
system
Programme
Timed op. +
control
impul.counter
 Touch the
No payment system
The display will change to the next set-
ting.
Completing the commissioning
process
To complete the commissioning pro-
cess, you must run the
 programme through to the end.
ing
The programme takes 20 minutes to
complete and must run with an empty
drum.
If the mains supply is interrupted (or
the appliance is shut down by press-
ing  before or during the
programme, commissioning will be
ing
cancelled. If this happens, the initial
commissioning process must be re-
peated.
 Confirm with the
Timed
COM module
operation
 sensor.
Commission-
Commission-
 sensor control.
OK
Initial commissioning
Overview
Commission–
ing
0:20
h
 Touch the flashing Start/Stop sensor
control.
 Once the programme has finished,
11:02
switch the tumble dryer off briefly and
then switch it back on again.
Commissioning is complete and the
tumble dryer is ready for drying.
OK
Weight
0,0
kg
11:02
29

Advertisement

Table of Contents
loading

Table of Contents