Completing The Commissioning Process - Miele PDR 908 HP Operating And Installation Instructions

Heat-pump dryer
Table of Contents

Advertisement

Setting up a payment system
(If applicable)
If you wish to set up a payment system,
read the "Payment system" section of
the "Supervisor level" chapter. These
settings can only be changed during
the initial commissioning process. If you
wish to change the settings after the
commissioning process, please contact
Miele Service.
If you do not wish to set up a payment
system, you can skip this stage.
Payment system
No payment
system
Program
Timed op.with
control
impulse count
 Touch the
No payment system
control.
The display will change to the next
setting.
Completing the commissioning
process
The commissioning process is
complete when a program lasting
longer than 20 minutes has been
carried out in full.
If the power is interrupted prior to the
start of the first drying program (e.g. if
the machine is switched off with the
 button), the initial commissioning
process can be completed again.
Once a drying program has been
running for over 20 minutes, the initial
commissioning process cannot be
performed again.
Timed
COM module
operation
 sensor
Initial commissioning
 Confirm with
 In the main menu, touch
the  
Programs
Programs
Automatic
plus
Microfibre
 Select the Timed drying cool air
11:02
program.
 Touch the Duration sensor control.
Duration
OK
 Place your finger on the number that
you want to change and move your
finger in the direction you want.
 Select a duration of 20 minutes.
 Confirm with
 Touch the flashing Start/Stop sensor
control.
After this program has finished, the
tumble dryer is ready for use.
OK
.
 sensor control.
Timed drying
Basket
warm air
program
Timed drying
Basket - Low
cool air
temperature
02
22
01
21
00
20
h
02
59
01
58
Reset
OK
.
11:02
11:02
OK
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents