Completing The Commissioning Process - Miele PDR 908 HP Operating And Installation Instructions

Heat-pump tumble dryer
Table of Contents

Advertisement

Setting up a payment system
If you wish to set up a payment system,
read the chapter "Supervisor level -
Payment system". These settings can
only be changed during the initial
commissioning process. If you wish to
change the settings later, please
contact Miele Professional Service.
If you do not wish to set up a payment
system, you can skip this step.
Payment system
No payment
system
Programme
Timed op. +
control
impul.counter
 Touch the
No payment system
The display will change to the next
setting.
Completing the commissioning
process
The commissioning process is
complete when a programme lasting
longer than 20 minutes has been
carried out in full.
If the power is interrupted prior to the
start of the first drying programme
(e.g. if the machine is switched off
with the  button), the initial
commissioning process can be
completed again. Once a drying
programme has been running for over
20 minutes, the initial commissioning
process cannot be performed again.
 Confirm with
OK
Timed
COM module
operation
sensor.
.
Using for the first time
 Touch the 
the main menu.
Programmes
Automatic
plus
Microfibre
 Select the Timed drying cool air
11:02
programme.
 Touch the Duration sensor.
Duration
OK
 Place your finger on the number that
you want to change and move your
finger in the desired direction.
 Select a duration of 20 minutes.
 Confirm with
 Touch the flashing Start/Stop sensor.
After the programme has finished, the
tumble dryer is ready for use.
Programmes
sensor in
Timed drying
Basket
warm air
programme
Timed drying
Basket - Low
cool air
temperature
02
22
01
21
00
20
h
02
59
01
58
Reset
OK
.
11:02
11:02
OK
29

Advertisement

Table of Contents
loading

Table of Contents