Completing The Commissioning Process - Miele PDR 908 HP EL Operating And Installation Instructions

Heat-pump dryer
Table of Contents

Advertisement

Completing the commissioning
process
The commissioning process is
complete when a program lasting
longer than 20 minutes has been
carried out in full.
If the power is interrupted prior to the
start of the first drying program (e.g., if
the machine is switched off with the
 button), the initial commissioning
process can be completed again.
Once a drying program has been
running for over 20 minutes, the initial
commissioning process cannot be
performed again.
 Confirm with
OK
 In the main menu, touch
the  
Programs
Programs
Automatic
Timed drying
plus
Timed drying
Microfiber
 Select the Timed drying cool air
program.
 Touch the Duration sensor control.
Duration
02
00
02
.
 sensor control.
Basket
warm air
program
Basket - Low
cool air
temperature
22
01
21
20
h
59
01
58
Reset
Initial commissioning
 Place your finger on the number that
you want to change and move your
finger in the direction you want.
 Select a duration of 20 minutes.
 Confirm with
 Touch the flashing Start/Stop sensor
control.
After this program has finished, the
tumble dryer is ready for use.
11:02
11:02
OK
OK
.
27

Advertisement

Table of Contents
loading

Table of Contents