Selecting Program Packages; Completing The Initial Commissioning Process - Miele PDR 914 Operating And Installation Instructions

Commercial tumble dryers
Hide thumbs Also See for PDR 914:
Table of Contents

Advertisement

Skipping payment
system setup

Selecting program packages

You can select various programs from the program packages. Any
programs already active are highlighted in orange.
Program packages
Label
Standard
Cottons 
Cottons
Cottons PRO
Minimum iron
Swipe to the left until you reach a program that is not highlighted in
orange.
Touch the program to be activated.
The selected program is now active highlighted in orange.
You can select further programs if required.
If you do not want to select any more programs, confirm with
The display will change to the next setting.
Tip: You can disable a selected program by touching the program
again. Exception: The
not be disabled.
Setting up a payment system
If you wish to set up a payment system, read the "Payment system"
section of the "Supervisor level" chapter. These settings can only be
changed during the initial commissioning process. If you wish to
change the settings after the commissioning process, please contact
Miele Service.
If you do not wish to set up a payment system, you can skip this
stage.
Payment system
No payment
Timed
system
operation
Program
Timed op. +
control
impul. counter
No payment system
Touch the
OK
Tap 
to confirm.
The display will change to the next setting.

Completing the initial commissioning process

The initial commissioning process is complete when a program last-
ing longer than 10 minutes has been carried out in full.
Before using for the first time
11:02
Woolens
Delicates
OK
Cottons 
Cottons PRO
and
11:02
KOM module
OK
 sensor control.
OK
.
programs can-
17