Mantel Clearances - Valor 2700KN Installation Manual

Table of Contents

Advertisement

Installation Planning
Combustible Mantel—Left Side View
Vent
Non-combustible
in this manual
this manual
(max. 1" [26 mm]
thick if combustible)
NON-COMBUSTIBLE Flush Hearth/Mantel Projections
HeatShift pipes (4)
45° from
outermost
Combustible mantels/
corner of trim
projections must be
kept behind this line
10"
[254 mm]
6"
[152 mm]
Outermost
corner of trim
4"
minimum
[102 mm]
to combustible hearth
Bottom of Unit
Max. 6" [153 mm]
non-combustible
projection allowed top and
bottom, at edge of trim.

Mantel Clearances

WARNING
HeatShift System MUST be
installed on this appliance!
38-3/16"
Mantel
[971 mm]
Height
(from
34-3/16"
Bottom
[869 mm]
of Unit)
28-3/16"
[717 mm]
(from Bottom
of Unit to Top
of Opening)
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lt22700kp

Table of Contents