EAS Electric EVRO-120NDC Installation Manual page 33

Table of Contents

Advertisement

Available languages

Available languages

The second cennect methond
Outdoor unit
4.7 Remove Dirt or Water in the Piping
Make sure there is no any dirt or water before connectiong
the piping to the outdoor units.
Wash the piping with high pressure nitrogen, never use
refrigerant of outdoor unit.
4.8 Airtight Test
Charge pressured nitrogen after connecting indoor/outdoor unit
piping to do airtight test.
CAUTION
1. Pressured nitrogen [ 4.3MPa (44kg/cm ) for R410A] should be
used in the airtight test.
2. Tighten high pressure/low pressure valves before
applying pressured nitrogen.
3. Apply pressure from air vent mouth on the hight pressure/
low pressure valves.
4. The high pressure/low pressure valves are closed when
applying pressured nitrogen.
5. The airtight test should never use any oxygen,
flammable gas or poisonous gas.
4.9 Air Purge with Vacuum Pump
Using vacuum pump to do the vacuum,never using refrigerant to
expel the air.
Vacuuming should be done from both liquid side and gas side
simultaneously.
Maximum pipe equivalent length
L
L
2
1
A
L
The First Line Branch Pipe
Indoor unit
2
Pipe length(From the nearest branch
pipe equivalent length
B
(From the first line branch pipe)
Maximum pipe equivalent length
3
L
4
C
L
5
4.10 Refrigerant Amount to be Added
Calculate the added refrigerant according to the diameter and the
length of the liquid side pipe of the outdoor unit/indoor unit
connection.
When the outdoor unit connects 1 indoor unit:
Table 4-12
Liquid Side Piping
Additional refrigerant volume of divergent pipe is 0.1kg
per item (Consider the liquid side of divergent pipe only)
10
N
a
b
c
N
3
D
N
4
d
E
f
e
N
5
N
6
Refrigerant to be Added
Diameter
Permeter Piping
Φ6.4
Φ9.5
Φ12.7
Φ15.9
Φ19.1
Φ22.2
NOTE
1
N
2
Fig.4-8
0.022kg
0.054kg
0.110kg
0.170kg
0.260kg
0.360kg
V.2

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Evro-140ndcEvro-160ndcEvro-160rdc

Table of Contents