Central-Site Bridging Architecture (56 Kbps) – Inactive Digital Bridge - Paradyne 3610 Application Manual

Data service units time division multiplexer, multichannel multipoint, and digital bridge options
Hide thumbs Also See for 3610:
Table of Contents

Advertisement

COMSPHERE 3600 Series Data Service Units
When full backup is in effect, there is no longer any
data communication from the DDS line. All tributaries are
communicating with the controlling DTE via the digital
bridge capability.
In a central-site multipoint dial backup configuration,
full backup is required if the DBM speed does not equal
the DSU speed, or if the control DSU reports No Signal or
Bipolar Violations. Under this condition, the bridge is
inactive during normal operation. To go into full backup,
the bridge may be activated by an 6800 Series NMS
Standby Facility (sf) command, or from the DCP Backup
Figure 4-36. Central-Site Bridging Architecture (56 kbps) – Inactive Digital Bridge
4-44
(Bkup) command. Figures 4-36 and
The 6700 Series NMS software uses a Device
Management window to indicate device status.
For full backup, it is assumed that the control DSU is
no longer receiving valid DDS timing. In this case, the
control DSU must be commanded from the DCP or NMS
to go into full backup. This action switches the connection
from the DDS line to the bridge and causes the digital
bridge to switch to the timing that is stored in the Brdg
Timing configuration option.
July 1999
4-37
illustrate this.
3610-A2-GB41-70

Advertisement

Table of Contents
loading

This manual is also suitable for:

3611Comsphere 3610Comsphere 3611Comsphere 3600 series

Table of Contents