Operation - HADEF 23/09 Installation, Operating And Maintenance Instructions

Aluminium spur gear hoist
Table of Contents

Advertisement

Operation

7
Operation
Pos: 12.2 /7--BEDIENUNG/Allgemein/01.Bedienung - Alle @ 0\mod_1173087534915_52.doc @ 440 @ @ 1
Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their
operation. They must be authorized by the employer for the operation of the equipment. The employer must
ensure that the operating instructions are available near the equipment and that they are accessible for the
operating personnel.
Pos: 12.3.1 /7--BEDIENUNG/Hand/Kettenzug + Fahrwerke/Alle H @ 0\mod_1182339959857_52.doc @ 6276 @ @ 1
Lifting and Lowering by pulling the endless hand
chain.
Lifting - pull the chain fall at the right side –
the hand chain wheel turns clockwise
Lowering - pull the chain fall at the lift side –
the hand chain wheel turns anti-clockwise
Illustration4
Pos: 12.3.2 /7--BEDIENUNG/Hand/Kettenzug + Fahrwerke/Alle H + Zusatz b.Fahrwerk @ 0\mod_1182783208251_52.doc @ 6601 @ @ 1
Monorail push travel trolleys are moved by pushing the load.
Monorail hand geared trolleys are moved by pulling the hand chain.
Pos: 12.3.3 /---ALLGEMEIN/Hinweise/Kettenzüge/WARNUNG - Hebezeug immer mittig hängen @ 0\mod_1177323079550_52.doc @ 5150 @ @ 1
WARNING!
The hoist must always hang centrally under the beam or under its suspension point.
Pos: 13.1 /9--INBETRIEBNAHME/*Ü1*/#. Kapitel - Inbetriebnahme @ 0\mod_1177486166685_52.doc @ 5393 @ @ 1
5.52.169.00.01.04
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

23/09 hh23/09 hr

Table of Contents