Tools; Operation; General; Safety Check - HADEF 18/16R-VA Instructions Manual

Table of Contents

Advertisement

6.4

Tools

18/16R-VA
18/16H-VA
7

Operation

Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their
operation. They must be authorized by the employer for the operation of the equipment. The employer must
ensure that the operating instructions are available near the equipment and that they are accessible for the
operating personnel.
Monorail push travel trolleys are moved by pushing the load.
Monorail hand geared trolleys are moved by pulling the hand chain.
7.1

General

Should the unit be used in Germany:
Please observe the validated, national accident prevention regulations.
For other countries:
Inspections as above. Please observe the national rules and regulations and the instructions in this manual!
NOTICE!
Hoists up to 1000 kg capacity and without motor-driven trolleys of hoisting unit must be tested by a "qualified
person" before putting into operation for the first time.
Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and trolley
movement, must be tested by a "licensed qualified person" before putting in operation.
An exception is "hoists ready for operation" acc. validated national regulations with EU-declaration of
conformity.
Definition "qualified person" (former expert)
A "qualified person" has learned, due to occupational training and experience and the job that the person has
done, the skills needed to tests the material for one's work.
Definition "licensed qualified person" (former approved expert)
A "licensed qualified person" has, due through special occupational training, knowledge about testing of the
material for one's work and knows the national accident prevention regulations and other prescriptions and
technical regulations. This person must test the material for one's work regularly with regard to design and
kind of use. The license will be given to qualified person be the approved supervision authorities (ZÜS).
8

Safety check

Before putting into service initially or when putting back into service, it must be checked whether:
All fastening screws (if existent), socket pins, flap socket and safety devices are tightened and secured.
9

Functional test

9.1

Checks before the initial start-up

Trolley drive
The open-lying teeth of the trolley drive must be lubricated.
Hand gear for hand geared trolley
Ensure correct fit of the hand chain; it must not be twisted and must hang freely.
5.52.122.00.01.02
500kg = SW30
1000kg = SW35
1000kg = SW55
2000kg = SW55
3000kg = SW65
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

18/16h-va

Table of Contents