Safety Check - HADEF 23/09 Installation, Operating And Maintenance Instructions

Aluminium spur gear hoist
Table of Contents

Advertisement

Safety check

9
Safety check
Pos: 14.2 /10-SICHERHEITSPRÜFUNG/Allgemein/01.Sicherheitsprüfung Alle @ 0\mod_1178197796463_52.doc @ 5700 @ @ 1
Before putting into service initially or when putting back into service, it must be checked whether:
 All fastening screws (if existent), socket pins, flap socket and safety devices are tightened and secured.
Pos: 14.3 /10-SICHERHEITSPRÜFUNG/Allgemein/Sicherheitsprüfung Ketten @ 0\mod_1172661092232_52.doc @ 429 @ @ 1
 The chains are correctly placed, oiled and in good condition.
Pos: 15.1 /11-FUNKTIONSPRÜFUNG/*Ü1*/#. Kapitel - Funktiosprüfung @ 0\mod_1176446880639_52.doc @ 4028 @ @ 1
5.52.169.00.01.04
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

23/09 hh23/09 hr

Table of Contents