4.4.3
Load attachment point in unpacked condition
Img.4-1:
Example of load suspension and lifting loads
Fix the load suspension gear on the eye bolt and beneath the drilling head.
Fasten the load end agent on the an adequate conveyor equipment, for instance a crane.
Dimensions on page 19.
4.4.4
Installation
Check that the geared drill foundation is horizontal with a spirit level.
4.4.5
Fixing
Fix the foot of the geared drill to the substructure with the holes pre-drilled for this purpose.
Floor loading on page 18
EN
B50 GSM
22
Load suspension
point
Eye bolt
Load suspension
point
Attachment
(4)
Img.4-2: Base B50 GSM
Translation of original instruction
Assembly
Version 1.1.5 - 2022-06-22