Load Attachment Point In Unpacked Condition; Installation; Fixing - Optimum OPTIdrill B 50GSM Operating Manual

Geared drill
Hide thumbs Also See for OPTIdrill B 50GSM:
Table of Contents

Advertisement

4.4.3

Load attachment point in unpacked condition

Img.4-1:
Example of load suspension and lifting loads
Fix the load suspension gear on the eye bolt and beneath the drilling head.
Fasten the load end agent on the an adequate conveyor equipment, for instance a crane.

Dimensions on page 19.
4.4.4

Installation

Check that the geared drill foundation is horizontal with a spirit level.
4.4.5

Fixing

Fix the foot of the geared drill to the substructure with the holes pre-drilled for this purpose.

Floor loading on page 18
EN
B50 GSM
22
Load suspension
point
Eye bolt
Load suspension
point
Attachment
(4)
Img.4-2: Base B50 GSM
Translation of original instruction
Assembly
Version 1.1.5 - 2022-06-22

Advertisement

Table of Contents
loading

This manual is also suitable for:

3034500

Table of Contents