IBM 4975 02L Maintenance Information page 70

Table of Contents

Advertisement

Reinstallation
6.
Reinstall the print emitter pickup (3252).
1.
Reinstall the ribbon drive assembly (3401) on the
7.
Reinstall the carrier belt clamp
G.
Ensure that
carrier.
the belt alignment is correct before tightening the
2.
Pivot the carrier and main shaft around the carrier
clamp (3305).
support shaft to clear the A-frame
E);
place the
8.
Perform the print emitter adjustment (3253).
assembly back into the printer.
9.
Assemble the printer to the printer base (3053).
3.
Tighten the screws • in the ends of the carrier
10. Reinstall
th~
print head (3351).
support shaft.
11.
Reinstall the ribbon cartridge (3405).
4.
Reinstall and tighten the screws
0
in each end of
12. Perform the carrier main shaft adjustment.
the carrier main shaft.
5.
Reinstall the ribbon drive cords (3404).
13. Reinstall the top cover (3052).
3-48
SY34-0613

Advertisement

Table of Contents
loading

This manual is also suitable for:

4975 02r

Table of Contents