PRIOR TO INSTALLATION
1. Measure cavity dimensions.
Ensure all minimum
specifications have been met and
clearances have been considered.
Check ventilation requirements
for LP cylinder storage cabinet
enclosures on page 9, and in the
Planning Guide.
2. Ensure ground is level
and clear.
3. Ensure services are
accessible and correctly
installed. Cabinetry should
allow access to gas and power
cables below the grill once
installed. Refer to the Planning
Guide for specifications.
dcsappliances.com/us/trade-resources/specify
14