Inline Feeder Cable Preparation; Use Cable Holder; Window Cut Mounted In The Closure - CommScope NOVUX SEC 100 Installation Instructions Manual

Fiber optic system
Table of Contents

Advertisement

6

Inline feeder cable preparation

Two window cuts should be made. One is the opening to pick the fiber and will be mounted in the closure. The other
one will be at least 1 m from the first window cut and will be used to cut the fiber. This second window cut can be pro-
tected with the clip afterward.
6.1

Use cable holder

The cable holder can be used with a CommScope cable of 9,2 mm.
1
1
Slide the cable holder between the cable and the mounting surface where the window cut should be created.
2
Secure the cable under the two locking tabs.
3
Now the shaving tool can be used to make the window cut.
6.2

Window cut mounted in the closure

1
1
Position the shaving tool on the cable at the left side of the bump.
2
Push firmly while moving to the right side over the complete length of the bump.
≥ 1 m distance
2
2
Window closure
8 cm +/- 0,5 cm
page 7 / 14
© 2022 CommScope, Inc. All Rights Reserved
Light signal
3
3
Window closure
8 cm +/- 0,5 cm

Advertisement

Table of Contents
loading

Table of Contents