Window Cut To Cut The Fiber; Inline Feeder Cable Installation; Indicate Mounting Position; Install The Inline Cable In The Closure - CommScope NOVUX SEC 100 Installation Instructions Manual

Fiber optic system
Table of Contents

Advertisement

3
The opening will be around 8 cm ±0,5 cm.
6.3

Window cut to cut the fiber

1
Window cut fiber
1
Position the shaving tool on the cable at the left side of the bump.
2
Push firmly while moving to the right side until the middle of the bump, indicated by a groove. Turn the shaving
tool away from the cable.
3
The opening will be around 3 cm ±0,5 cm.
7

Inline feeder cable installation

7.1

Indicate mounting position

1
optional
1
There are 4 mounting position options to mount the closure. It is preferred to use the 2 upper mounting positions.
Note:
Make sure the window cut is in the middle of the closure, in the foreseen cavity.
2
Drill the holes and insert the plugs.
7.2

Install the inline cable in the closure

1
1
Remove the seals from the closure.
2
Cut an opening from the bottom side in one of the feeder ports.
3
For a cable larger then 10 mm cut away the inner rubber.
2
3 cm +/- 0,5 cm
optional
2
© 2022 CommScope, Inc. All Rights Reserved
2
page 8 / 14
3
Window cut fiber
3 cm +/- 0,5 cm
Ø 8-≤ 10 mm
3
Ø >10-12 mm

Advertisement

Table of Contents
loading

Table of Contents