Power On; Initial System Setup; Flush Before Using Equipment; Valve Settings - Graco ProMix PD2K Operation

Electronic positive displacement proportioner
Hide thumbs Also See for ProMix PD2K:
Table of Contents

Advertisement

Pre-Operation Tasks

Power On

On
Power
Power
On
1. Turn the AC Power Switch (P) ON (I = ON,
0 = OFF).
2. The Graco logo will display while the system
initializes, followed by the Home screen.
3. Press the Start key
change from "System Off" to "Startup." Once
the pumps are powered and are in the Home
position, the system status will change from
"Startup" to "Standby."
Figure 2 Power Switch
24
. The system status will
Initial System
System Setup
Setup
Initial
Initial
System
Setup
1. Change optional setup selections to
desired parameters, as described in
Setup Mode Screens, page
2. Set recipe and flush information as
described in
Recipe Screen, page 104
Flush Screen, page
Flush Before
Before Using
Using Equipment
Flush
Flush
Before
Using
The pump fluid section was tested with lightweight
oil, which is left in the fluid passages to protect parts.
To avoid contaminating your fluid with oil, flush the
equipment with a compatible solvent before using
the equipment.
Valve

Valve Settings

Valve
Settings
Settings
Dose valves and purge valves are factory set with the
hex nut (E) 1-1/4 turns out from fully closed.
Figure 3 Valve Adjustment
96.
and
106.
Equipment
Equipment
3A4128D

Advertisement

Table of Contents
loading

Table of Contents