Installation and Operating Instructions
Central ventilation units AIR1 XVP
EN
3. Fix the pipe bend below the condensation tray. Ensure that the construction is water-tight by turning the pipe con-
nector (see Fig.8).
Fig8
4. Unlock and open the doors with the key included in the scope of delivery (see Fig.9).
Fig9
5. Remove the condensate cap with a screwdriver (see Fig.10).
Fig10
6. Unscrew the condensate cap from the screw and tighten the screw with a screwdriver (see Fig.11).
Fig11
8