MTS9300A Telecom Power (Claro, Colombia,
MTS9304A-AM10A1)
Installation Guide
5.2 (Optional) Installing Communications Cables
If Huawei BBU is deployed, connect a communications cable between the SMU
and Huawei BBU. The U2000-SPM and NetEco network management systems
(NMSs) are supported.
5.2.1 WebUI Management
Procedure
Step 1 Connect the FE port on the site monitoring unit (SMU) by using a network cable.
Figure 5-2 Connecting a communications cable (for WebUI management)
(1) User WebUI terminal
----End
5.2.2 Using the U2000-SPM for Management
Procedure
Step 1 Connect one end of a network cable to the RS485/RS232 port on the SMU.
Step 2 Connect the other end of the cable to the MON0 or MON1 port on Huawei BBU.
Issue 01 (2021-05-30)
NO TICE
Copyright © Huawei Technologies Co., Ltd.
(2) FE port on the SMU
5 Installing Cables
31