(This lift may be installed either symmetrically or asymmetrically)
10,000
. C
(
2500 lbs. per Arm)
LBS
APACITY
2311 South Park Rd. Louisville, Kentucky 40219
Email:
Web site:
sales@challengerlifts.com
www.challengerlifts.com
/
Office 800-648-5438
502-625-0700 Fax 502-587-1933
IMPORTANT:
READ THIS MANUAL COMPLETELY BEFORE
INSTALLING or OPERATING LIFT
Rev. 2023/11/16

Advertisement

Table of Contents
loading

Summary of Contents for Challenger Lifts SA10

  • Page 1 Installation, Operation & Maintenance Manual Two Post Surface Mounted Lift SA10 ODEL (This lift may be installed either symmetrically or asymmetrically) 10,000 2500 lbs. per Arm) APACITY 2311 South Park Rd. Louisville, Kentucky 40219 Email: Web site: sales@challengerlifts.com www.challengerlifts.com Office 800-648-5438...
  • Page 2: Specifications

    Model SA10 Installation, Operation and Maintenance ENERAL PECIFICATIONS See Figure 1 SA10 (Symmetric Install) SA10 (Asymmetric Install) 136 1/2" 142 1/2" (3467mm/3620mm) A Overhead Height (Adjustable) - with 2Ft Column Extension Kit 160 1/2" / 166 1/2” (4077mm/4230mm) B Overall Height (Cylinder) 142 1/2”...
  • Page 3 Model SA10 Installation, Operation and Maintenance Safety decals similar to those shown here are found ERTICAL LEARANCE on a properly installed lift. Be sure that all safety Check the height of the area where the lift is to be decals have been correctly installed on the columns installed.
  • Page 4: Installation

    Model SA10 Installation, Operation and Maintenance ECEIVING NSTALLATION The shipment should be thoroughly inspected as AFETY EQUIREMENTS FOR NSTALLATION AND soon as it is received. The signed bill of lading is ERVICE acknowledgement by the carrier of receipt in good Refer to ANSI/ALI ALIS (current edition) condition of shipment covered by our invoice.
  • Page 5 Model SA10 Installation, Operation and Maintenance NCHORING Note:  The anchor bolts must be installed at least 8” from any crack, edge, or expansion joint. Recheck the area around both base plates.  Use a concrete hammer drill with a 3/4 inch carbide bit.
  • Page 6 Model SA10 Installation, Operation and Maintenance Fig 6 – Overhead 14) Install Overhead Limit Switch to the Overhead Fig. 7b – Overhead Limit Switch Idler Side Beam on the Power Side of the lift. See Fig 7a. YMMETRIC 16) For Asymmetric installation, skip to Step 18.
  • Page 7 Model SA10 Installation, Operation and Maintenance Fig 9 – Symmetric Overhead Mounting Fig 11 – Asymmetric Sheave Assembly SYMMETRIC NCHORING 21) Check Idler Column shimming. Use additional 19) Place the Overhead on top of the mounting shims (see Fig 5) to remove any gaps that may...
  • Page 8 Model SA10 Installation, Operation and Maintenance Fig 13 – Cable Trapping YDRAULIC OSES 29) Attach Power Hose to Cylinder Fitting at the bottom of the Power Column as shown in Fig 14 Fig 12a – Cable Attachment Points below. Repeat with longer Idler Hose and Idler Column.
  • Page 9 Model SA10 Installation, Operation and Maintenance on the same side as the hose guides welded on the Columns. IMPORTANT: ENSURE HOSE DOES NOT CONTACT CYLINDERS WHEN LIFT IS FULLY RAISED POWER SIDE Fig 15 – Hose Routing 31) Remove the Plug from the left side and relocate it to the right side.
  • Page 10 Model SA10 Installation, Operation and Maintenance Fig 19– Lock Release Cover Fig 18a – Lock Release (Idler Side) YMMETRIC NSTALLATION 37) For Asymmetric installation, skip to step 39. Ensure the Inner Gear is positioned on the arms as shown in Fig 20. Lubricate the Arm Pin or carriage arm pin hole with “anti-seize”...
  • Page 11 Model SA10 Installation, Operation and Maintenance 48) Connect Contactor to Power unit as shown. Connect Contactor to suitable electrical source as shown. IMPORTANT: A FTER WIRING HAS BEEN COMPLETED & O TEST OPERATION OF OWER VERHEAD IMIT SWITCH HILE RAISING LIFT...
  • Page 12 Model SA10 Installation, Operation and Maintenance 55) Energize power unit again for 10 seconds. With FINAL CHECKOUT PROCEDURE a clean rag, wipe down both cylinder rods. (The 63) Demonstrate the operation of the lift to the cylinders are shipped with a small amount of...
  • Page 13 Model SA10 Installation, Operation and Maintenance Wiring Diagram FOR SINGLE PHASE ORIGINALLY CONNECTED TO A2 (Normally Open) FIELD CONNECTIONS FIELD CONNECTIONS FOR THREE PHASE FACTORY WIRED FOR 208−240V RECONNECTIONS FOR 440−480V Fig 22 – Electrical Wiring Diagram Page 13 SA10-IOM-A .doc...
  • Page 14: Operation Procedure

    Model SA10 Installation, Operation and Maintenance The Owner/Employer shall display the lift PERATION ROCEDURE manufacturer’s operating instructions; ALI/SM, ALI Lifting it Right safety manual; ALI/ST, AFETY OTICES AND ECALS ALI Safety Tips card; ANSI/ALI ALOIM, American This product is furnished with graphic safety...
  • Page 15: Lifting A Vehicle

     Check adapters for damage or excessive wear. vehicle seems unstable, lower the lift and readjust the arms. If the vehicle is stable, raise Replace as required with genuine Challenger Lifts the vehicle to a height a few inches above the parts.
  • Page 19 Model SA10 Installation, Operation and Maintenance REVISIONS 2019/11/19 – UPDATED MISSING CONNECTION IN ELECTRICAL DIAGRAM. UPDATED SAFETY REQUIREMENTS FOR INSTALLATION AND SERVICE. ADDED STEP TO CHECK THE ARM STOP BOLTS TO MAKE SURE THEY ARE TIGHT. 2020/02/14 – 20mm FLAT WASHERS WERE ADDED TO THE LOCK CLEVIS PIN TO HELP KEEP THE SPRINGS ON THE PIN.