Bed Rail Installation - Proactive Protekt Akra PMSEBHR User Manual & Entrapment Manual

Home care beds
Hide thumbs Also See for Protekt Akra PMSEBHR:
Table of Contents

Advertisement

BED RAIL INSTALLATION

Full Bed Rails: To install Full Bed Rails, lift the head section and find the rail
receptacle located on the frame of the bed as shown (Fig A). Pull receptacle
outward and return head section to the flat position. Turn receptacle in a vertical
position to receive the rail (Fig B). Repeat for all four rail receptacles.
A
Full Bed Rail Operation: Pull out Pull Pin on each bracket one at a time to raise
or lower rail. Ensure Pull Pins are properly engaged to lock rails in position.
Half Bed Rails:
To install half rails, locate the label located on the head section of the frame
(Fig D). The half rail clamp should be installed over this label. Align fixed clamp
jaw (Fig E) in front of bed frame rail as shown below. Align movable clamp jaw
on top of bed frame rail, and turn knob clockwise until clamp is tight, securing
safety rail to bed frame rail (Fig F).
D
Half Bed Rail Operation: Pull out Pull Pin on each bracket to raise or lower rail.
Ensure Pull Pin is properly engaged to lock rail in position.
NOTE: Bed rails should be removed when bed is disassembled to help
prevent damage.
CORRECT
When installing bed rail,
only place one (1) rail on
bed per side.
WARNING - INCORRECT MOUNTING MAY CAUSE INJURY OR DEATH
User Manual & Entrapment Guide
B
E
DO NOT place 2 bed rails
on the same side of the bed
as shown above.
F
INCORRECT
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Protekt akra pmsebfrProtekt akra pmfebfr

Table of Contents