Target Group, Personnel - Pepperl+Fuchs Bebco EPS 5500 Series User Manual

Type z and ex pzc purge and pressurization system
Table of Contents

Advertisement

In addition, the documentation may comprise the following parts, if applicable:
Manufacturer declaration of conformity

EU declaration of conformity

Control drawings

Additional documents


1.2. Target group, Personnel

Responsibility for planning, assembly, commissioning, operation, maintenance, and
dismounting of the 5500 series lies with the plant operator. Personnel working on this
system must:
be familiar with the occupational safety and accident prevention regulations and

have been briefed regarding handling of the unit.
have the additional knowledge of explosion protection that is requied for work on

explosion-protected components.
be familar with the relevant rules and regulations for the installation, operation,

and maintenance of explosion-protected systems.
have read the safety section and warnings in this manual.

The operator and/or installer must also ensure that:
the 2-wire RTDs for temperature sensors are suitable for the area classification,

Zone 2, or Zone 22, Class I, Zone 2. Maximum length is 3m.
the bypass switch is suitable for the area classification, Zone 2 or Zone 22, Class

I, Zone 2.
the intrinsically safe aspects of the system are installed in accordance with

manufacturer's control drawing number 116-B026.
that the 5500 system is used as a purge controller and not protected by purging

and pressurization
all electrical, mechanical, and pneumatic connections have been made in

accordance with this manual and any other applicable standards and laws.
 i
5500 S
M
 i
erieS
anual
nTroducTion
nTroducTion
7

Advertisement

Table of Contents
loading

Table of Contents