Hardware Kit; Torque Requirements: Control Unit - Pepperl+Fuchs Bebco EPS 5500 Series User Manual

Type z and ex pzc purge and pressurization system
Table of Contents

Advertisement

2.3.4

Hardware Kit

The hardware mounting kit is included. It contains the following:
Mounting hardware: screws, nuts, and sealing washers
Hole size: 6.4 mm
Pressure kit: bulkhead fitting, O-ring and tubing inserts, straight connector, sintered element for
bulkhead fitting
Panel hole size 29/34 inch (11.5 mm )
2.3.5

Torque Requirements: Control Unit

Hardware
I.S. and power terminal
Bypass and temperature terminal
Earth ground
Main lid
Mounting (CU)
CG M12
CG M20
Bulkhead fitting nut
Compression fitting tube end
* When finger tightening, take care not to overtighten!
5500 S
M
erieS
anual
Torque
0.5–0.6 Nm
0.22–0.25 Nm
7.5 Nm
7.5 Nm
7.5 Nm
7.5 Nm
6 Nm (M20 thread)
Cap nut:
Single: 18 Nm
Double: 22 Nm
Triple: 24 Nm
0.5 turn past finger tight*
1 1/4 turns past finger tight*
 P
d
roducT
eScriPTion
21

Advertisement

Table of Contents
loading

Table of Contents