Connecting Rapid Shutdown Signal Cables - Huawei SUN2000-8K-LC0 Series User Manual

Hide thumbs Also See for SUN2000-8K-LC0 Series:
Table of Contents

Advertisement

SUN2000-(8K, 10K)-LC0 Series
User Manual
Step 2 Connect the signal cable connector to the COM port.
Figure 5-31 Securing the signal cable connector
----End

5.7.5 Connecting Rapid Shutdown Signal Cables

Procedure
Step 1 Connect the signal cable to the signal cable connector block.
Issue 01 (2023-09-15)
Table 5-5 Cable connections
Cable
1
2
Copyright © Huawei Digital Power Technologies Co., Ltd.
Pin
Definition
3
485B2
4
485A2
3
485B2
4
485A2
5
GND
6
EN+
5 Electrical Connections
To
Power
485B
meter
485A
Batter
485B
y
485A
Enable-
Enable+
68

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-10k-lc0 seriesSun2000-8k-lc0Sun2000-10k-lc0Sun2000-8k-lc0-zhSun2000-10k-lc0-zh

Table of Contents