Huawei SUN2000-8K-LC0 Series User Manual page 38

Hide thumbs Also See for SUN2000-8K-LC0 Series:
Table of Contents

Advertisement

SUN2000-(8K, 10K)-LC0 Series
User Manual
Avoid drilling holes into the water pipes or power cables buried in the wall.
Figure 4-7 Expansion bolt composition
(1) Bolt
(4) Flat washer
● To prevent dust inhalation or contact with eyes, wear safety goggles and a dust
● Use a vacuum cleaner to clean up dust in and around the holes, and measure
● Level the top of the expansion sleeve with the concrete wall after removing the
● Loosen the nut, spring washer, and flat washer of the expansion bolt at the
Issue 01 (2023-09-15)
D ANGER
NO TE
● M6x60 expansion bolts are delivered with the inverter. If the length and amount of the
bolts do not meet installation requirements, prepare M6 stainless steel expansion bolts
by yourself.
● The expansion bolts delivered with the inverter are mainly used for solid brick-concrete
walls. For other types of walls, prepare bolts by yourself and ensure that the wall meets
the load bearing requirements of the inverter.
NO TICE
mask when drilling holes.
the spacing. If the holes are inaccurately positioned, drill the holes again.
nut, spring washer, and flat washer. Otherwise, the mounting bracket will not
be securely installed on the concrete wall.
bottom.
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Nut
(5) Expansion sleeve
4 Installation
(3) Spring washer
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-10k-lc0 seriesSun2000-8k-lc0Sun2000-10k-lc0Sun2000-8k-lc0-zhSun2000-10k-lc0-zh

Table of Contents