SUN2000-(8K, 10K)-LC0 Series
User Manual
Figure 5-24 Connecting cables to the SmartGuard
Procedure
Step 1 Connect the signal cable to the signal cable connector block.
●
Issue 01 (2023-09-15)
Connecting the inverter to the SmartGuard
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Electrical Connections
63